Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects, Unpublished PhD Thesis, , Ohio State University.

Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates, Unpublished PhD Thesis, , The Ohio State University.

Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait, Unpublished PhD Thesis, , Ohio State University.

El-khawas, I N (1997) The optimal design of buildings: A life-cycle approach to energy efficiency, Unpublished PhD Thesis, , The Ohio State University.

Ellis, R A (1980) An analysis of the impact of public participation activities in water and transportation projects, Unpublished PhD Thesis, , Ohio State University.

Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems, Unpublished PhD Thesis, , Ohio State University.

Garrett, C C (1991) Roadway infrastructure management and investment behavior studies for developing countries: A multicriteria approach to road improvement decision-making, Unpublished PhD Thesis, , The Ohio State University.

Godby, C J (2002) A computational study of lexicalized noun phrases in English, Unpublished PhD Thesis, , The Ohio State University.

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities, Unpublished PhD Thesis, , The Ohio State University.

Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts, Unpublished PhD Thesis, , The Ohio State University.

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties, Unpublished PhD Thesis, , Ohio State University.

Mahmood, N A (2021) Real-time site safety risk assessment and intervention for on-foot building construction workers using RFID-based multi-sensor intelligent system, Unpublished PhD Thesis, , The Ohio State University.

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan, Unpublished PhD Thesis, , Ohio State University.

Sadoun, B I (1992) A modeling methodology for energy-conserving site design, Unpublished PhD Thesis, , The Ohio State University.

Sarma, K C (2001) Fuzzy discrete multicriteria cost optimization of steel structures using genetic algorithm, Unpublished PhD Thesis, , The Ohio State University.

Sirca, G F (2019) Analysis of full-scale in-service civil engineering structures, Unpublished PhD Thesis, , The Ohio State University.

Stanbury, J A C (1992) An exploratory empirical study of the international consulting engineering design services industry: A United States perspective, Unpublished PhD Thesis, , Ohio State University.

  • Type: Thesis
  • Keywords: competition; competitiveness; market; measurement; markets; client; consultant; engineering consultant
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304010682
  • Abstract:
    The thesis of this dissertation is that U. S. Consulting Engineering Design Services Firms appear to be losing their competitiveness in the International Consulting Engineering Design Services Market, a process that has apparently taken place in the last thirteen years. The general objective of this research was to learn more about U. S. CEDSF's and their activities in the International Markets. Specifically, the study attempted to determine the actual size of both the domestic and international markets for International Design Services, the dimensions that may be used to describe its demand structure, and the nature and extent of competition, and the influence of other macro variables in this industry. This research employed a two stage methodology. The first stage was archival and incorporated the use of the Engineering News Record (ENR) data base which was derived from published annual surveys describing this industry. The second phase involved attempts to obtain additional data through the use of written requests to ENR and other data sources. The results of the study were somewhat inconclusive. This is because accurate, meaningful measurements of market size and other key variables could not be determined from the available data. The inquiry determined that other types of firms such as Engineer-Constructors (EC's), Manufacturers, and Non Engineering Consultants have not been included in the ENR surveys. The activities of EC's, were added from 1988, and have gradually increased their significant role in this market. Data from Eximbank and the Office of the Trade and Development Program (TDP) revealed that Manufacturers are also active to a much greater degree than was originally thought. In addition, the inquiry determined that projects may be delivered using at least five different methods. These are "The Traditional Client-Consultant", "The In-House", "The PPM/CM for a Fee, and at Risk", and "The Design-Construct (aka Engineer-Construct, or Turnkey)" methods. The contribution of the latter two methods were not accounted for in any of the surveys. Finally, examination of data provided by the World Bank and Asian Development Bank (ADB) revealed that U. S. firms' share of both markets had declined significantly in the last decade, though each is considered as a growth opportunity.

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE), Unpublished PhD Thesis, , The Ohio State University.

Vargas, C A (1998) Investigating construction falls using fault tree analysis and developing a prototype tool to reduce falls using expert system and computer-assisted instruction methods, Unpublished PhD Thesis, , The Ohio State University.

Wee, S (1993) A prototype of an expert system for pavement maintenance and rehabilitation strategy in the state of Ohio (espresso), Unpublished PhD Thesis, , The Ohio State University.

Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality, Unpublished PhD Thesis, , The Ohio State University.

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date, Unpublished PhD Thesis, , Ohio State University.

Young, D R (1968) The development of a construction industry interest inventory, Unpublished PhD Thesis, , The Ohio State University.

Yu, B (2007) Essays on structural analysis of procurement auctions, Unpublished PhD Thesis, , The Ohio State University.